Master Flok
Soil stabilization additive for subgrade and earthworks. Improves bearing capacity and workability under specified conditions.
Dosage, application, compaction, and verification to spec.
System Definition: Soil testing and suitability, dosage and application protocol, compaction and curing, verification testing.
Operating Context
- Iraq road and infrastructure programmes require robust subgrade treatment.
- Standardized application supports schedule and quality certainty.
- Field-verifiable results align with institutional and contractor requirements.
- Logistics and climate favour documented, repeatable methods.
System Scope
- Soil testing and suitability assessment
- Dosage and application protocol
- Compaction and curing
- Verification testing
- Material specification and traceability
- Interface with pavement or structure
- Quality documentation
- Handover and as-built
Execution Protocol
Inputs & Specification
- Soil investigation and test results
- Stabilization spec and dosage
- Compaction and curing requirements
- Acceptance criteria
Site Conditions
- Moisture and temperature limits
- Access and sequencing
- Material delivery and storage
- Weather windows
Installation / Deployment
- Application and mixing to spec
- Compaction and curing
- Inspection points
- Documentation
Verification & Handover
- Testing and verification
- As-built records
- Handover to following layers
- Traceability
Constraints & Risk Controls
- Moisture content and temperature for application and curing
- Transport and storage of additive
- Sequencing with weather and access
- QC tolerances for dosage and compaction
- Compliance with pavement or structure spec
- Verification testing windows
Outcomes
- Stabilized subgrade performance to spec
- Repeatable application method for similar corridors
- Field-verifiable results and documentation
- Higher schedule certainty through standardized deployment
Related Systems
Professional Request Brief
Submit scope, constraints, timeline, and location for review.
Request Brief