Asateen Group
MASTER CTS

A clear delivery method.

We move from study to install with checks at each step.

Share your project basics.

Seven phases

  • Phase 1: Site study and fit check.
  • Phase 2: Engineering and system design.
  • Phase 3: Build prep (sourcing, assembly, or local build).
Ask for an engineering review
We can start with a short call.

Quality checks (QA/QC)

  • Pre‑deploy inspection and on‑site checks.
  • Batch traceability and compliance papers.
  • Performance tests when needed.
Request compliance dossier
Shared after review.

Aftercare

  • Monitoring plan and guidance.
  • Lifecycle checks where needed.
  • Support for long‑term performance.
Start an Engage request
Pick your path and send details.