Asateen Group
MASTER CTS

Keep value in Iraq.

A phased plan to reduce import exposure for key engineered inputs.

Shared after review.

Why this matters

  • High‑value inputs are often imported.
  • This drives FX outflow and lead‑time risk.
  • Local value capture stays limited.
Request document access
Tell us what you need.

Three layers

  • Layer 1: control specs and standardize design.
  • Layer 2: do assembly and processing inside Iraq.
  • Layer 3: full localization with raw material processing.
Schedule a capital call
Investor path in /engage.

Expected impact areas

  • Lower currency exposure over time.
  • More stable supply for national programs.
  • Lower lifecycle cost through better systems.
Start an Engage request
Government or investor path.