Skip to content

Infrastructure

Baghdad — Al Dora Thermal Station Infrastructure Upgrade

Iraq — Baghdad

Period: 2011–2014

Delivered

High-voltage electrical infrastructure enhancement supporting thermal generation operations.

Scope

  • Supply of high-voltage transformers (33–132 kV).
  • Electrical infrastructure enabling works.
  • Operational support integration as required by station needs.

Constraints

    Outcomes

      Professional Request Brief

      Submit scope, constraints, timeline, and location for review.

      Request Brief