Skip to content

Infrastructure · 2024

Baghdad Ring Road — Base Treatment

Iraq — Baghdad

In Progress

Subgrade stabilization and base treatment for road corridor. Soil stabilization and specified compaction protocols.

Systems Deployed

Scope

  • Soil testing and suitability assessment
  • Stabilization additive application
  • Compaction and curing verification
  • Quality documentation
  • Interface with pavement layers

Constraints

  • Traffic and access sequencing
  • Seasonal moisture variation
  • Supply and logistics for additive

Outcomes

  • Stabilized subgrade to spec
  • Field-verifiable compaction
  • Documented application method

Professional Request Brief

Submit scope, constraints, timeline, and location for review.

Request Brief