Skip to main content

Execution Portfolio

Projects Portfolio

Evidence of delivery across Iraq.

Projects are presented as an operating record: infrastructure, industrial work, public works, housing, water, and heritage—delivered under real constraints.

Organized for fast scanning and comparison, with a clear path to request project-specific technical briefs.

Projects
65
Sectors
6
System-linked
25

Index structure

Recorded projects by sector

Counts are taken from the public project index; bars show relative mix within the portfolio, not performance metrics.

Public Works24
Infrastructure20
Industrial9
Housing7
Heritage4
Water1

Sector legend

Public Works: 24Infrastructure: 20Industrial: 9Housing: 7Heritage: 4Water: 1

Bars show the visible mix of recorded projects by sector.

Project Filters

Scan the delivery record with more control.

Filter by sector, status, location, or linked system, then sort the portfolio by the view that matters.

12 results · 1 active filter

Public WorksDelivered

Baghdad — Al-Mustansiriyah University

Iraq — Baghdad

Period: 2024

Secondary roof and envelope components executed using Master Board for performance and speed under controlled site constraints.

Linked systems

Master Board
  • Secondary roof cladding/lining works using Master Board
  • Fixing method alignment and interface detailing
  • Handover readiness and documentation support
IndustrialDelivered

Baghdad — Medical Gases Plant

Iraq — Baghdad

Period: 2024

Industrial facility envelope works using Master Board for durable, controlled, and fast installation.

Linked systems

Master Board
  • Master Board cladding supply and installation coordination
  • Interface detailing and sealing strategy support
  • Execution documentation and handover readiness
HousingDelivered

Dujail — Tourism Resorts

Iraq — Multi-site

Period: 2024

Master Board cladding programme across tourism resort assets, focused on fast envelope closure and consistent finish quality.

Linked systems

Master Board
  • Multi-site supply logistics and deployment planning
  • Installation method standardization
  • Quality control and finishing alignment
IndustrialDelivered

Fallujah — MOPAR Vehicle Service Center

Iraq — Al Anbar — Fallujah

Period: 2024

Master Board envelope/cladding delivery for an automotive service facility, prioritizing speed, durability, and clean finish.

Linked systems

Master Board
  • Supply and installation of Master Board cladding
  • Substructure readiness and fastener detailing
  • Delivery coordination and commissioning readiness support
Public WorksDelivered

Dhi Qar — Local Administration Stadium

Iraq — Dhi Qar — Nasiriyah

Period: 2023

Master Board envelope/cladding deployment for stadium facility components with durability and speed-of-install focus.

Linked systems

Master Board
  • Master Board supply and installation coordination
  • Substructure readiness and fixing method alignment
  • Moisture and fire performance detailing considerations
Public WorksDelivered

Dhi Qar — Schools Construction Programme

Iraq — Dhi Qar — Nasiriyah

Period: 2023

Schools programme executed using steel structural frames with Master Board envelope systems for rapid delivery and repeatability.

Linked systems

Master Board
  • Steel frame execution coordination and sequencing
  • Master Board envelope installation and detailing
  • Safety, quality, and handover documentation alignment
Public WorksDelivered

Mosul — Commercial Buildings

Iraq — Nineveh — Mosul

Period: 2023

Multi-building Master Board cladding programme to accelerate façade closure and improve envelope performance.

Linked systems

Master Board
  • Master Board supply and site deployment across multiple buildings
  • Fixing method and substructure coordination
  • Delivery sequencing and execution documentation
Public WorksDelivered

Mosul — Electricity Directorate

Iraq — Nineveh — Mosul

Period: 2023

Envelope upgrade works using Master Board to improve durability and facility readiness.

Linked systems

Master Board
  • Master Board cladding supply and installation coordination
  • Detailing at interfaces (edges, openings, transitions)
  • Handover readiness and final inspection support
IndustrialDelivered

Mosul — Industrial Sheds

Iraq — Nineveh — Mosul

Period: 2023

Industrial shed envelope works using Master Board to accelerate closure and improve durability in industrial conditions.

Linked systems

Master Board
  • Master Board supply and installation coordination
  • Substructure readiness and fixing method alignment
  • Delivery sequencing and final inspection support
HeritageDelivered

Mosul — Old City Markets

Iraq — Nineveh — Mosul

Period: 2023

Restoration-linked envelope works using Master Board to support rehabilitation of market structures in old city context.

Linked systems

Master Board
  • Restoration-aware envelope planning and deployment
  • Master Board installation with careful interface detailing
  • Documentation and handover readiness
IndustrialDelivered

Baghdad — Pharmaceutical Warehouse

Iraq — Baghdad

Period: 2022

Warehouse build using steel structural frame with Master Board envelope systems for rapid delivery and controlled performance.

Linked systems

Master Board
  • Steel frame execution coordination
  • Master Board envelope installation and detailing
  • Handover readiness and documentation alignment
HeritageDelivered

Baghdad — Iraqi Museum

Iraq — Baghdad

Period: 2021

Master Board envelope and protection works supporting museum facility needs with controlled installation and documentation.

Linked systems

Master Board
  • Envelope works planning and specification support
  • Master Board supply and installation coordination
  • Interface detailing and finish control in sensitive context