Project Overview:

In the years 2007-2008, Asateen Group took on a significant rehabilitation project for the Haswa Police Station. The scope of the initiative encompassed the comprehensive revitalization of the entire center. This included furnishing, equipping electric generators, and installing control systems, surveillance cameras, and firefighting systems.


Key Components:

1. Center Rehabilitation:

- Asateen Group led the rehabilitation efforts, focusing on the entire Haswa Police Station. The objective was to enhance the functionality, safety, and overall efficiency of the center.


2. Furnishing and Equipping:

- The project included the furnishing of various spaces within the police station, creating a conducive and well-equipped environment for the personnel. Additionally, essential equipment and facilities were provided to support the daily operations of the station.


3. Electric Generators:

- As part of the rehabilitation, electric generators were installed to ensure a reliable power supply. This measure aimed to maintain uninterrupted operations even in challenging situations.


4. Control Systems and Surveillance Cameras:

- The installation of modern control systems and surveillance cameras was a pivotal aspect of the project. This technological enhancement was implemented to fortify security measures and provide a robust monitoring system for the entire police station.


5. Firefighting Systems:

- Ensuring the safety of the Haswa Police Station, firefighting systems were integrated into the infrastructure. This proactive measure aimed to mitigate fire-related risks and enhance the overall safety protocols within the center.


Project Duration:

The rehabilitation project spanned the years 2007-2008.


Project Impact:

The rehabilitation efforts led by Asateen Group significantly transformed the Haswa Police Station, upgrading its infrastructure and operational capabilities. The furnished and equipped spaces, along with advanced security and safety systems, contributed to a more efficient and secure environment for the police personnel.


Conclusion:

The commitment of Asateen Group to the rehabilitation of Haswa Police Station during 2007-2008 exemplifies a dedication to enhancing public safety infrastructure. Through comprehensive efforts in furnishing, equipping, and implementing advanced systems, the project aimed to create a modernized and secure environment for the dedicated personnel serving the community.

 
 
 