2009 Baghdad Provincial Council Electric Generator Installation and Infrastructure Development
- Asateen Group

- Nov 20, 2023
- 2 min read
Project Overview:
Between 2008 and 2009, the Baghdad Provincial Council, in collaboration with Asateen Group, launched a pivotal project to address and enhance the region's electric power infrastructure. The primary focus was on supplying and installing electric generators in alignment with a comprehensive plan designed to compensate for electric power fluctuations and shortages. Asateen Group played a crucial role in executing this initiative. In addition to generator deployment, the project encompassed the construction of ceilings and control rooms, essential components for the effective operation and maintenance of the installed generators.
Key Components:
1. Electric Generator Supply and Installation:
- Asateen Group strategically supplied and installed electric generators, strategically positioned to address and compensate for electric power fluctuations and shortages within the region.
2. Ceiling Construction and Control Rooms:
- Infrastructure development, including the construction of ceilings and control rooms, was undertaken by Asateen Group. These components were crucial for ensuring the optimal functioning and maintenance of the installed generators.
Project Duration:
The project spanned from 2008 to 2009.
Project Impact:
The collaborative initiative by the Baghdad Provincial Council and Asateen Group had a profound impact on the electric power landscape of the region. The addition of strategically placed generators, coupled with the construction of ceilings and control rooms by Asateen Group, significantly contributed to a more stable and reliable electric power supply, meeting the growing demands of the community.
Conclusion:
The commitment of the Baghdad Provincial Council, in partnership with Asateen Group, to the Electric Generator Installation and Infrastructure Development project from 2008 to 2009 reflects a proactive approach to addressing critical energy needs. By deploying generators and enhancing the necessary infrastructure, the project aimed to ensure a consistent and reliable electric power supply, ultimately benefiting the residents and businesses within the region.

Comments